Protection Engineering

Precise Implementation · High-End Solutions

Static protection is based on engineering. We focus on standardized processes, precise implementation and strict acceptance,
building a physical static protection barrier.

EPA Static Protection Area Sole Dust Removal Systematic Configuration Solution

Core Goal: Follow the golden principle of "Physical Cleaning Prior to Electrical Testing", adopt a 6-step standardized compliance process to completely solve the three major problems of sole contamination, static risk and excessive humidity. Eliminate frequent audit deduction points, meet ANSI/ESD S20.20, IEC, ISO 14644 standards, achieve real data, equipment safety and zero pollution in the workshop.

EPA Sole Dust Removal Integrated System

🎯Core Design Principles

Dust First → Test Later · Real Data Wet & Dry Combination · Controlled Humidity ESD Compatible · Grounding ≤4Ω 6-Step Standard · Audit Bonus Humidity Control · Zero Risk Full Traceability

🧼Hardware Configuration List

Intelligent Sole Cleaning Machine
  • Intelligent Sole Cleaner Deep Decontamination
    Sensor start, stainless steel body, automatic water supply/drainage, wet/dry dual-use
  • Sticky Dust Mat Primary Dust Removal
    30-40 layers, medium-high viscosity, aluminum alloy edge wrapping
  • Water-Absorbent Carpet Humidity Control
    High water absorption, anti-static material, easy to clean
  • Dust Removal Roller Manual Reinforcement
    Washable silicone roller, vertical stand for blind spots
  • ESD Tester Compliance Detection
    Dual test for wrist strap/shoes, dry judgment, data recording
  • Integrated Control Cabinet Intelligent Control
    PLC controller, voice broadcast, abnormal alarm

⚙️Integrated Linkage Logic

Air Shower & Dust Removal Linkage
  • Permission Trigger
    After identity verification, sticky mat area unlocks and dust removal starts
  • Process Interlock
    ESD tester locks if water absorption re-inspection is not completed
  • Dry Judgment
    Sole resistance <10MΩ = over-humid, system locks gate with voice prompt
  • Qualified Release
    Air shower unlocks if ESD test passes; blocked if failed

🔗Recommended Golden Standard Process (Revised)

Adopt the core logic: Identity Verification → Physical Dust Removal → Static Test → Air Shower Release:

Step Node Name Key Action Why Here?
1 Identity Verification Card / Face Recognition Access control. Unauthorized personnel are blocked in advance.
2 Sticky Dust Mat Step on Sticky Mat Primary dust removal. Remove large particles to avoid clogging the cleaner.
3 Intelligent Sole Cleaner Brush Cleaning Deep decontamination. Remove stubborn oil and particles from soles.
4 Water Absorption / Re-inspection Absorbent Carpet + Roller Humidity control. The most critical step, ensure dry soles before entering EPA.
5 ESD Test & Gate Open Wrist Strap/Shoe Test Compliance interception. Clean & dry soles ensure accurate test results.
6 Air Shower High-Speed Air Blowing Final purification. Blow off floating dust before entering the workshop.

Process Visualization:

1
Identity Verification

Identity Verification

Cleanroom Access Control

2
Sticky Dust Mat

Sticky Dust Mat

Workshop Entrance Sticky Mat

3
Intelligent Sole Cleaner

Sole Cleaner

Automatic Sole Cleaning Machine

4
Water Absorption

Water Absorption

Absorbent Carpet & Drying

5
ESD Test

ESD Test

Shoe/Wrist Strap Static Test

6
Air Shower

Air Shower

EPA Cleanroom Air Shower

⚠️Core Pitfalls in Process Design

Conclusion: Always perform "Sole Dust Removal" before "ESD Test"

If the process is "ESD Test → Dust Removal", 3 serious compliance loopholes will occur (frequent audit deductions):

💡Advanced Optimization (Professional Grade)

🚫Process Risk Comparison (Audit Deduction Points)

Why "ESD First → Dust Removal" is NOT Recommended?

Evaluation ESD First → Dust Removal Dust Removal First → ESD
Test Accuracy Low Dirty Soles Error High Clean Soles Real Data
Workshop Humidity High Risk Wet Shoes In Controlled Dry Shoes In
Equipment Life Short Electrode Corrosion Long Dry Electrodes
Audit Result Deduction Frequent Loophole Bonus Standard Compliance

🛠️Operation & Compliance Management

Maintenance Item Frequency Standard Requirement Compliance Purpose
Water Replacement Daily/Per Shift DI/Pure Water Only Prevent scale & mineral pollution
Brush Cleaning Weekly Remove hair/lint Maintain cleaning effect & hygiene
Sticky Mat Replacement As Needed Replace when non-sticky Ensure particle adsorption
Absorbent Carpet Replacement Daily Replace when saturated Ensure dry soles, zero humidity risk
ESD Tester Calibration Monthly Calibrate with standard resistor Ensure accurate test data
Effect Verification Monthly Particle counter comparison Data for ISO/audit verification

📌Solution Summary

Core Iron Law: Always put "Physical Cleaning" before "Electrical Testing"

Verification → Sticky → Clean → Dry → ESD Test → Air Shower

The Perfect, Zero-Loophole, Full-Score EPA Entrance Control Process